The city of new york the new york state energy conservation construction code also regulates the design and construction of heating ventilating and air conditioning systems in new york city.
New york city requirements for roof mounted hvac equipment.
New york epa section 608 certification the environmental protection agency epa requires all hvac technicians that work with refrigerants to be certified.
Is mounted on the floor and has a compressor which is 5 horse power or more.
Commissioning required when permitted heating capacity 600kbtu h and or cooling capacity 480 kbtu h.
Standard for the installation of air conditioning and ventilation systems.
A permit to operate an air conditioning and ventilating equipment requires an equipment use permit prior to operation of the machinery.
Appliances equipment fans or other components that require service are located within 10 feet 3048 mm of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches 762 mm.
Is mounted on or suspended from a roof or a ceiling.
A fdny inspector will visit the premises annually and perform an inspection prior to permit expiration.
With a 3 150 ton capacity range and efficiency ratings as high as 17 5 seer york commercial packaged rooftop units in both a c and packaged heat pump models balance minimized installation and operating costs and come smart equipment enabled.
C compliance with code and other laws.
New applications for buildings erected under the 2008 code must comply with the 2014 code as required by ac 28 101 4 and 102 4 3.
See administrative code sections 28 105 1 28 105 4 item 6 and 28 105 4 2 1.
Currently section 3405 01 of the fire department s rules title 3 of the rules of the city of new york allows mobile heating and power generating trailers to operate with a citywide permit and sets forth permit supervision and design and installation requirements.
The new york city building code exempts only the following.
A partially enclosed rooftop structure used to aesthetically conceal heating ventilating and air conditioning hvac electrical or mechanical equipment from view.
2016 ecc 103 and 1 rcny 5000 01.
Any exemptions outlined by this rule will not grant authorization for.
And therefore may be exempt from the permit requirements of the new york city construction codes.
Most but not all air conditioning systems require this type of permit.
An interlocking metal sheet having a minimum installed weather exposure of 3 square feet 279 m 2 per sheet.
In order to obtain epa certification hvac technicians must take an exam which has 80 multiple choice questions that must be completed within 3 hours.
27 105 4 and 1 rcny 101 14 exemptions from permit requirement.
Metal roof panel.